Emirates Industrial Panel (EIP)
Distributed Generation
760,690 kWh
Annual Energy Generated/
Cost Savings
510+ metric tons
CO2 emissions avoided
8,450+
Trees planted equivalency
Project Details
Location | Dubai, UAE |
Installation Type | Solar Rooftop |
System Size | 458 kWp |
Agreement Period | 15 years |
Status | In Operation |
Overview
Positive Zero has partnered with Emirates Industrial Panel (EIP), a subsidiary of TIG Holding, to install a 458 kWp solar system on their rooftop as a part of the business commitment to sustainability and net zero targets. This installation has reduced grid dependency and allowed them to become more energy resilient.
Highlights
Fully built, financed and operated by Positive Zero, the project marks the beginning of on-site renewable energy generation at EIP's manufacturing facility.
With an installed capacity of 458 kWp, the solar plant is expected to generate more than 11.4 GWh of clean electricity over the lease period, avoiding over 7,660 metric tons of carbon emissions. That environmental impact is equivalent to growing a total of 126,750+ trees over 10 years, powering almost 1,600 homes, or removing almost 1,790 passenger vehicles from the road.