Emirates Industrial Panel (EIP)

Distributed Generation

760,690 kWh

Annual Energy Generated/

Cost Savings

510+ metric tons

CO2 emissions avoided

8,450+

Trees planted equivalency

Project Details


Location

Dubai, UAE

Installation Type

Solar Rooftop

System Size

458 kWp

Agreement Period

15 years

Status

In Operation


Overview

Positive Zero has partnered with Emirates Industrial Panel (EIP), a subsidiary of TIG Holding, to install a 458 kWp solar system on their rooftop as a part of the business commitment to sustainability and net zero targets. This installation has reduced grid dependency and allowed them to become more energy resilient.

Highlights

Fully built, financed and operated by Positive Zero, the project marks the beginning of on-site renewable energy generation at EIP's manufacturing facility.

 

With an installed capacity of 458 kWp, the solar plant is expected to generate more than 11.4 GWh of clean electricity over the lease period, avoiding over 7,660 metric tons of carbon emissions. That environmental impact is equivalent to growing a total of 126,750+ trees over 10 years, powering almost 1,600 homes, or removing almost 1,790 passenger vehicles from the road.