Index Tower
Energy Efficiency
$ 771k
Cost savings
1.2k Tons
CO2 emissions avoided
18.7k +
Trees planted equivalency
Project Details
Location | Dubai, UAE |
Contract Type | Shared Savings EPC |
Scope of Work | Design, Installation, O&M |
Agreement Period | 5 Years |
Status | In Operation |
Overview
Positive Zero partnered with Index Tower in Dubai to implement a 5-year Design, Build, and Operate Solution. This turn-key project reduced operational costs and the facility's carbon footprint while optimizing energy performance.
Highlights
Taka Solutions implemented energy efficiency measures such as chilled water network optimization, DX unit retrofits, and BMS recommissioning.
The project achieved 53% energy savings, equating to 1.83 million kWh annually, avoided 1,250 tons of CO₂ emissions, and delivered environmental benefits equivalent to planting 18,750 trees.