top of page

Index Tower

Energy Efficiency

$ 771k

Cost savings

1.2k Tons

CO2 emissions avoided

18.7k +

Trees planted equivalency

Project Details


Location

Dubai, UAE

Contract Type

Shared Savings EPC

Scope of Work

Design, Installation, O&M

Agreement Period

5 Years

Status

In Operation


Overview

Positive Zero partnered with Index Tower in Dubai to implement a 5-year Design, Build, and Operate Solution. This turn-key project reduced operational costs and the facility's carbon footprint while optimizing energy performance.

Highlights

Taka Solutions implemented energy efficiency measures such as chilled water network optimization, DX unit retrofits, and BMS recommissioning.


The project achieved 53% energy savings, equating to 1.83 million kWh annually, avoided 1,250 tons of CO₂ emissions, and delivered environmental benefits equivalent to planting 18,750 trees.